
Air Suspension Pump for Viano Air Suspension Pump Kompresor W211 E Klasss Jeep Cherokee 2011 Suspension Air Pump
Huizhou Cartee Electric & Machinery Co., Ltd.- After-sales Service:1 Year
- Warranty:1 Year
- Material:Copper Iron
- Certification:ISO,TS16949, ISO9001
- Car Make:Carteeair
- OEM:Yes
Base Info
- Model NO.:X275
- Type:Air Suspension
- Specification:17L*9W*12CM
- Trademark:CARTEEAIR
- Origin:Huizhou, China
Description
*Voltage: 13.8V
Duty Cycle Reference Chart:
Duty cycle refers to the amount of time a compressor can be operated in a given time period at 100 PSI, and a standard ambient temperature of 72° F. It is commonly expressed in percentage format:
Compressor on time ÷ (on time + off time) = Duty Cycle %.
Please Note: All compressors, regardless of rated duty cycle, require sufficient rest time in between cycles to allow for partial or complete heat dissipation. Heat dissipation rates may vary depending on ambient temperatures and operating conditions.





TANK FILL RATES
1.0 GALLON TANK | FILL RATE |
0 to 105 PSI | 1 min. 05 sec. (± 05 sec.) |
85 to 105 PSI | 14 sec. (± 03 sec.) |
0 to 145 PSI | 1 min. 45 sec. (± 05 sec.) |
110 to 145 PSI | 30 sec. (± 03 sec.) |
2.5 GALLON TANK | FILL RATE |
0 to 105 PSI | 2 min. 45 sec. (± 10 sec.) |
85 to 105 PSI | 40 sec. (± 05 sec.) |
0 to 145 PSI | 4 min. 30 sec. (± 10 sec.) |
110 to 145 PSI | 1 min. 35 sec. (± 05 sec.) |
Duty Cycle Reference Chart:
Duty cycle refers to the amount of time a compressor can be operated in a given time period at 100 PSI, and a standard ambient temperature of 72° F. It is commonly expressed in percentage format:
Compressor on time ÷ (on time + off time) = Duty Cycle %.
Please Note: All compressors, regardless of rated duty cycle, require sufficient rest time in between cycles to allow for partial or complete heat dissipation. Heat dissipation rates may vary depending on ambient temperatures and operating conditions.
ONE HOUR DUTY CYCLE (100 PSI @ 72° F) | MINUTES ON / MINUTES OFF |
9% Duty Cycle | 5 Min. On / 55 Min. Off |
10% Duty Cycle | 6 Min. On / 54 Min. Off |
15% Duty Cycle | 9 Min. On / 51 Min. Off |
20% Duty Cycle | 12 Min. On / 48 Min. Off |
25% Duty Cycle | 15 Min. On / 45 Min. Off |
30% Duty Cycle | 18 Min. On / 42 Min. Off |
33% Duty Cycle | 20 Min. On / 40 Min. Off |
50% Duty Cycle | 30 Min. On / 30 Min. Off |
100% Duty Cycle | 1 Hour Run Time |





