
OEM 2520 Custom Made Joint Flange for Exhaust Muffler Auto Parts
Baoding Haoxu Electric Technology Co., Ltd.- After-sales Service:13 Months
- Warranty:13 Months
- Type:Auto Fasteners
- Material:Steel
- Muffler Type:Front Muffler
- Deck:Single
Base Info
- Model NO.:Drawing mapping customization
- Casting Tolerance:Greater Than +,-0.15mm
- Casting Finish:Ra6.3
- Surface:Sandblast Passivation
- Transport Package:Carton + Wooden Box
- Specification:0.4kg-45kg
- Trademark:HAOXU
- Origin:Baoding, Hebei, China
- HS Code:870892000
- Production Capacity:500000PCS
Description
304/316/316L/CF3/CF8/CF8M/1.4301/1.4408/1.4404/SCH22/SCS13/SCS14/17-4PH/WCB/GS45/HKNPT / BSPT / BSP / DIN / ISO Product weight 0.005kg~45kg Dimensional tolerance Casting ISO8062 CT5~CT7 ; Machining ISO2768 Manufacturing process Precision casting, investment casting, precision machining NC/CNC Tee, elbow, union, pair wire, quick connector, clamp connector, valve, valve body,
pump, impeller, mechanical parts, food machinery, stainless steel customized parts TianJin / QingDao / ShangHai /BeiJin Samples are 25-35 days; the order can be adjusted according to the situation for 55 days of normal manufacturing period. We have more than 15 years of manufacturing management experience;
we have professional technical engineers in investment casting, machining and quality inspection;
we have long-term stable and continuous optimization of product quality and supply cycle management planning.

Product Show





FAQ
1,What are your strengths?
We have foundry workshop and machining workshop; We have an independent quality inspection team and production process management team; We can provide you with the drawing mapping, mold or product design and manufacturing, as well as the inspection and monitoring management of your products in China;
2,When can I get the price?
The quotation shall provide detailed and complete information within 24 hours after receiving the inquiry. And solutions.
3,How long can you finish the sample?
It is usually completed in 3-5 weeks; Different products adjust the cycle.
4,How long can you finish the order?
After receiving the sample confirmation information, the casting time is usually 6-7 weeks; The finished product was added for another 2-3 weeks;
We welcome your inquiry and cooperation!
Baoding haoxu Electric Technology Co., Ltd
pump, impeller, mechanical parts, food machinery, stainless steel customized parts
we have professional technical engineers in investment casting, machining and quality inspection;
we have long-term stable and continuous optimization of product quality and supply cycle management planning.

Product Show






1,What are your strengths?
We have foundry workshop and machining workshop; We have an independent quality inspection team and production process management team; We can provide you with the drawing mapping, mold or product design and manufacturing, as well as the inspection and monitoring management of your products in China;
2,When can I get the price?
The quotation shall provide detailed and complete information within 24 hours after receiving the inquiry. And solutions.
3,How long can you finish the sample?
It is usually completed in 3-5 weeks; Different products adjust the cycle.
4,How long can you finish the order?
After receiving the sample confirmation information, the casting time is usually 6-7 weeks; The finished product was added for another 2-3 weeks;
We welcome your inquiry and cooperation!
Baoding haoxu Electric Technology Co., Ltd